The Deputy Chief Fire Officer (DCFO) presented the report to members.

 

Lancashire Fire and Rescue Service (LFRS) allocated resources based on risk through its Community Risk Management Plan, risk modelling, and service reviews. Emergency cover reflected the most effective and efficient use of resources for the whole of Lancashire. Some areas had more resources than others because there were greater community risks and activity levels were higher.

 

Fleetwood Fire Station had two fire engines: one wholetime fire engine crewed by firefighters working the wholetime 2/2/4 duty system and one on-call fire engine crewed by on-call firefighters. The trial affected the wholetime fire engine which had changed from 2/2/4 to flexible day crewing (FDC) for a period of 18 months. The trial was to change a crewing system, not to reduce the number of fire engines covering the area, and there was no change to the on-call fire engine.

 

The decision to proceed with the trial was informed by a detailed review of operational evidence, community risk data and feedback received through the consultation. Views from employees, representative bodies, local residents, and other stakeholders were carefully considered before a decision was reached.

 

The FDC duty system was already operating successfully at five other Lancashire fire stations, providing valuable experience and evidence to support this trial.

 

The trial was designed to:

  • Confirm that FDC could meet operational risk and demand in Fleetwood.
  • Improve workforce sustainability and reduce reliance on compulsory transfers and significant detachments into the station under the current crewing model.
  • Support wider service resilience by releasing wholetime resources.

 

The anticipated impacts were:

  • At night, the response time from call receipt to crews attending the incident was expected to increase slightly as firefighters would need to travel to the station within five minutes before mobilising. 
  • Emergency response standards were maintained with FDC crewing arrangements.
  • No overall reduction in firefighter posts.
  • Prevention and protection activities would be maintained.

 

Consultation outcomes

Consultation with stakeholders began at the start of 2026 and public consultation took place via an online survey and public events during June 2026. The Consultation Document was available at Appendix 1 of the report.

 

The proposal received the support of the Fire Brigades Union and a majority of employees who responded during the consultation period. A public survey was conducted and a public information event was held at the fire station to give residents the opportunity to share their views and ask questions directly. 8 people attended the public event and there were 148 responses to the public survey. In response to a question about the trial in principle:

  • 18% strongly agreed or agreed with the proposed trial in principle
  • 2% neither agreed nor disagreed with the proposed trial in principle
  • 80% disagreed or strongly disagreed with the proposed trial in principle

 

Further details were available in Appendix 2 of the report.

 

Consultation respondents who disagreed with the trial expressed concerns about the potential impact on response times at night and community safety. These concerns were carefully considered and assessed against operational evidence. A predominantly low risk area, Fleetwood had some medium risk areas and one high risk area. There were no very high-risk areas. The FDC duty system aligned firefighter availability with community risk and incident levels in Fleetwood, and maintained the Service’s ability to meet its emergency response standards, both locally and across Lancashire.

 

There were also robust systems in place to monitor and manage risk and incident levels across the county in real-time, enabling the Service to move fire engines and firefighters to where they were needed at any given time. The closest fire engines were always mobilised to critical incidents. This may not be those based in the nearest fire station, which may already be attending an incident or involved in training or other activities. There were 58 fire engines and 45 specialist appliances in Lancashire and they were moved around the county to meet risk and demand.

 

Importantly, emergency response deals with the consequences of risk, while prevention activity reduced or removed the risk in the first place. Dedicated prevention services would continue in Fleetwood communities throughout the trial to keep reducing the likelihood of fires and other emergencies occurring. These included the home fire safety check and business fire safety services, fire safety education, and prevention campaigns.

 

It was identified in the consultation that some people held a perception that the trial could lead to the loss of the on-call fire engine at Fleetwood or the closure of the station. This was not the case.

 

Implementation

The trial started on 7 September 2026. The staffing model was 12 wholetime firefighter posts, aligned to FDC duty system arrangements, with all posts ultimately being filled from existing wholetime staff living within a five-minute radius of the station.

 

Firefighters displaced from Fleetwood had been placed at stations with crewing requirements across the county. This had largely resulted in a reduction in travel time and distance for these members of staff. Fleetwood was now crewed by firefighters living within a five-minute radius of the station, which was predicted to give a more sustainable crewing model, using members of the local community.

 

There was no change to the on-call crewing arrangements at Fleetwood and there had been no reduction in the overall number of firefighters in the Service.

 

Evaluation

The 18-month trial would be subject to robust monitoring and formal evaluation at 6, 12 and 18 months, providing assurance that public and firefighter safety remained paramount throughout. The evaluation would assess emergency response performance, appliance availability and operational resilience, incident demand, prevention and protection activity, operational preparedness and competence, any actions identified in the equality impact assessment and workforce sustainability. It would also consider staff and stakeholder feedback and any unintended consequences arising from the change.

 

Performance would be considered against appropriate pre-trial baseline data and agreed measures, enabling any emerging issues to be identified and addressed at the earliest opportunity.

 

It was proposed that an evaluation report was taken to the next Performance Committee meeting following 6, 12 and 18 month points in the trial:

  1. 7 March 2027
  2. 7 September 2027
  3. 7 March 2028

 

The final evaluation would provide members with a comprehensive evidence base to inform any decision regarding the future crewing arrangements at Fleetwood Fire Station. A copy of the evaluation criteria was included as Appendix 4 within the agenda pack.

 

County Councillor A Ali thanked the officers involved in the pilot and the Fire Brigades Union (FBU) for their support.

 

Councillor B Langford explained that he had sent a number of questions via email to Democratic Services yesterday evening in relation to this item and asked the following questions;

  1. Would the decision to extend the trial or make it permanent come back to the full authority;
  2. What were the trigger points for reversing the trial and could the nighttime incident data be provided before the 6-month review; and
  3. Could the remaining points included within the email including the request for an equality impact assessment and confirmation of what share of the ‘£1.8 million optimised wholetime crewing efficiency’ be answered in writing and circulated to all members.

 

The DCFO confirmed that any decision to make the trial permanent would be a member decision and could be considered as part of an emergency cover review (ECR) which would include consultation with members of the public, unions and staff members. Alternatively, the decision could be considered as part of the trial reviews which were proposed to be completed by the Performance Committee, with any decision taken through Planning Committee and the full Authority.

 

The DCFO explained that details on trigger points were included within appendix 4 of the report and would be considered by the Performance Committee as part of the review process. The DCFO thought that the nighttime data had been included within a previous report brought to the authority in June 2026 but explained that this could be circulated to members if this was not the case.

 

The DCFO confirmed that the Fleetwood trial did not form part of the £1.8 million efficiencies and staffing was not reduced. He confirmed that a written response would be received in due course.

 

The Chair remarked that the public engagement evets held at Fleetwood Fire Station had been positive and requested that the slide deck used at these events be circulated to members. He suggested that similar events could take place around the county to educate councillors on the role of the service.

 

The DCFO explained that LFRS’s average response time to critical fires was roughly two minutes quicker than the national average and the key performance indicators (KPIs) set by the authority set the standard for the whole of Lancashire. The CFO added that the service would be scrutinised as part of its HMICFRS inspection on its utilisation of resources inline with risk and demand around the county.

 

The Chair requested that analysis of the free text consultation responses be shared with members. The ACFO confirmed that this could be shared and explained that the public engagement events had helped to address misconceptions and confirm that the service was retaining its two fire engines at Fleetwood.

 

The report was proposed by County Councillor I Duxbury and seconded by County Councillor J Tetlow with all members voting in favour.

 

Resolved: - That the Authority;

  1. Noted the contents of the report and evidence supporting the decision.
  2. Approved monitoring of trial evaluation at 6, 12 and 18 months by the Performance Committee.

 